Waste water treatment facilities with a capacity of 20 000 m3 per day
Location: Geokdepe district, Akhal region, Akhal village Treatment facilities are one of the main strategically important structures that must ensure biological treatment of wastewater. In connection with this project, it is planned to build a treatment plant outside the city limits, but in close proximity to it, along the main highways. The construction site has a fenced rectangular configuration with dimensions of 275 x 150 m. The following facilities are located on the territory of the waste water treatment plant: an administrative building, a compressor station, a transformer station, a pumping station, a workshop, a warehouse, an electrolysis station, a security room, a filtration building, sludge dewatering shop, aeration tank, preliminary treatment facility, mud and oil trap, sludge thickening tank, settling tank, contact tank and recycled water tank, storage tank, laboratory building, cesspool, sludge draining beds, pumping station for backwash water. The project also provides lighting of the site, concreting of driveways and platforms, and landscaping of the rest of the area.